2021 Fuel Gas Inspector Certification Exam Quiz Welcome to your free 2021 Fuel Gas Inspector Certification Exam Quiz REQUIRED - Enter your email address to receive a printable copy of your test results. 1. When a gas appliance is installed on a roof, the edge of the roof must be equipped with a guardrail if the appliance is located within ________ of the roof edge. 3 feet 6 feet 10 feet 15 feet None 2. What is the minimum required size for an attic access opening when a gas-fired appliance is located in the attic space? 20 inches by 24 inches 22 inches by 30 inches 24 inches by 30 inches 30 inches by 30 inches None 3. Unlisted gas appliances installed in commercial settings generally require a minimum clearance to combustible materials of ________, unless a specific approved protection method is used. 6 inches 12 inches 18 inches 36 inches None 4. The maximum design operating pressure for a standard low-pressure gas piping system located inside a commercial building shall not exceed ________ unless specific strict conditions (like welded piping in a vented shaft) are met. Add description here! 2 psig 5 psig 10 psig 15 psig None 5. Which of the following locations is strictly PROHIBITED for the installation of gas piping? Concealed inside a wall cavity Through an exterior foundation wall In a circulating air duct Under a concrete slab-on-grade (when properly sleeved and vented) None 6. Underground gas piping must be installed with a minimum cover (burial depth) of: 6 inches 12 inches 18 inches 24 inches None 7. When installing horizontal 3/4-inch threaded steel gas piping, what is the maximum allowable distance between pipe supports? 6 feet 8 feet 10 feet 12 feet None 8. Corrugated Stainless Steel Tubing (CSST) gas piping systems must be bonded to the electrical service grounding electrode system. The bonding jumper wire must be sized no smaller than: 8 AWG copper 6 AWG copper 4 AWG copper 2 AWG copper None 9. Before a new gas piping system is put into service, it must be pressure tested. The minimum test pressure shall be 1.5 times the maximum working pressure, but not less than ________. 3 psig 5 psig 10 psig 15 psig None 10. How long is the minimum required duration for a standard gas pipe pressure test under the IFGC? 5 minutes 10 minutes 15 minutes 30 minutes None 11. An appliance shutoff valve must be located in the same room as the appliance it serves and within a maximum distance of: 3 feet 6 feet 10 feet 15 feet None 12. When a sediment trap (drip leg) is required, it must be installed: Upstream of the appliance shutoff valve Downstream of the appliance shutoff valve At the gas meter only Horizontally across the gas line None 13. A flexible gas connector used to connect a commercial gas range or clothes dryer to the gas supply piping is limited to a maximum length of: 3 feet 4 feet 6 feet 8 feet None 14. When using the standard indoor method to calculate required combustion air, the space must have a minimum volume of ________ per 1,000 Btu/h of the total input rating of all appliances in the space. 25 cubic feet 40 cubic feet 50 cubic feet 100 cubic feet None 15. If using the "Two-Opening Method" to provide combustion air directly from the outdoors, each opening must have a free area of 1 square inch per ________ Btu/h of total appliance input rating. 1,000 2,000 3,000 4,000 None 16. If using the "One-Opening Method" for outdoor combustion air, the opening must commence within 12 inches of the top of the enclosure and have a minimum free area of 1 square inch per ________ Btu/h of total input rating. 1,000 2,000 3,000 4,000 None 17. A Type B gas vent terminating above a flat roof (pitch of flat to 6:12) must terminate a minimum of ________ above the highest point where it passes through the roof. 1.0 foot 2.0 feet 3.0 feet 4.0 feet None 18. What is the minimum required upward slope for a horizontal vent connector connecting a draft-hood-equipped appliance to a chimney or vent? 1/8 inch per foot 1/4 inch per foot 1/2 inch per foot 1 inch per foot None 19. Unvented room heaters are strictly prohibited from being installed in which of the following locations? Add description here! Warehouses Commercial kitchens Group I (Institutional) occupancies, such as hospitals or nursing homes Retail sales floors None 20. A commercial gas clothes dryer exhaust duct must have a smooth interior finish and must be constructed of: PVC schedule 40 Rigid metal (such as galvanized steel or aluminum) Flexible aluminum foil Polyethylene tubing None Prove you are human Time is Up!