Pass the ICC 530 South Dakota Electrical Contractor Exam

-

Master the Code, Master the Exam – Build your future with confidence!

  • Passing the 2023 ICC South Dakota 530 Electrical Contractor exam has never been easier using our 100% online course!
  • We’re here to help you every step of the way.

 

$249.00

Available on backorder

SKU: ICC SD 530 Category:

Why Thompson Learning Co?

TLC Experience

BBB A+ Rating

Self Paced

Here to Help

Our 2023 ICC 530 Electrical Contractor Exam Prep Course Description

Our 2023 ICC 530 South Dakota Electrical Contractor Exam Prep Course is a 100% online, self-paced program designed to help you prepare efficiently and confidently for the ICC 530 Electrical Contractor exam. Tailored to meet South Dakota’s licensing requirements, this course focuses on navigating the 2023 National Electrical Code (NEC) and understanding the key concepts necessary to pass the exam.

With in-depth codebook training, you’ll gain the skills needed to confidently navigate the NEC, along with access to flashcards, exam simulations, and other essential study tools to help you prepare effectively.

SD 530 Electrical Contractor Course Outline – 100% Online

        • Access for 1 Year unless you pass sooner
        • Electrical Theory Module
        • Print Reading Module
        • NEC Codebook Navigation
        • Codebook Speed Drills for Quick Reference
        • Use of Table of Contents
        • Mastering the Index
        • Answering Questions by Keyword
        • Code Skimming Practice Exercises
        • Chapter-Specific Review Questions
        • Flashcards for Key Concepts
        • Full-Length Weighted Exam Simulations
        • Refund – policy

2023 NEC Softcover
$216.95

This course is designed to be used alongside the 2023 NEC Codebook – the official reference used during the ICC 530 exam.

2023 NEC Index Tabs
$25.00

Index Tabs are designed to help you quickly locate key sections of your NEC codebook during the exam.

Take a FREE 530 South Dakota Electrical Contractor Practice Quiz

Pass this 20-question free 530 Electrical Contractor exam, and see where you stand! These 2023 ICC 530 exam practice questions, based on the 2023 NEC, are similar to the ICC 530 test questions found on the actual Electrical Contractor exam.

 

Welcome to your 530 South Dakota Electrical Contractor Exam

1. 
You need a branch-circuit conductor for a 40 A non-continuous load in EMT with 8 current-carrying conductors. Conductors are THHN copper (90 °C). Ambient temperature is 40 °C. What is the minimum conductor size required after applying adjustment and correction factors?

2. 
A feeder supplies a 200 A panelboard. What is the minimum copper equipment grounding conductor size required?

3. 
The disconnecting means for a 50 HP, three-phase, 460 V induction motor shall have a minimum ampere rating of:

4. 
What is the minimum receptacle rating permitted on a 20 A branch circuit that supplies two or more receptacles or outlets?

5. 
What is the maximum conduit fill percentage allowed for more than 2 conductors in a raceway?

6. 
For a building supplied by a single service, what is the maximum number of service disconnects permitted?

7. 
What is the minimum width of working space required for a panelboard?

8. 
A 100 A feeder is supplying a panel 150 ft away at 208 V, 3-phase. THHN copper conductors, 75°C rating. What is the recommended maximum voltage drop for efficiency?

9. 
A 4″ square box contains: Four #12 current-carrying conductors, One #12 equipment grounding conductor, One yoke-mounted duplex receptacle. What is the minimum required box volume?

10. 
For a 400 A service with 600 kcmil Cu service entrance conductors, what is the minimum GEC size?

11. 
The motor disconnecting means must be located:

12. 
For equipment 480 V-to-ground with exposed live parts on one side and grounded parts on the other, minimum working space depth is:

13. 
General lighting load for office areas shall be calculated at:

14. 
Which of the following describes a Class I, Division 1 location?

15. 
What is the minimum rating of the branch circuit required to supply a commercial electric sign or outline lighting system?

16. 
Which of the following is required for single-phase, 120V through 240V pump motors connected to permanently installed swimming pools?

17. 
What is the maximum system voltage permitted for underwater luminaires supplied by a listed low-voltage lighting system?

18. 
How many branches must the essential electrical system in a hospital have?

19. 
How many receptacles are required at each patient bed location in general care areas?

20. 
What is required for branch-circuit wiring serving patient care areas?

Prove you are human:

Register with ICC to take your 530 South Dakota Electrical Contractor exam via PearsonVUE.