Pass the ICC Missouri Springfield Master Mechanical W29 Exam

Become ICC Springfield Missouri Master Mechanical W29 licensed (Online and self-paced)

If your state, county, or city licensing agency requires you to pass the ICC W29 Springfield Missouri Master Mechanical exam, complete our online ICC exam preparation course, then schedule your exam through Pearson|VUE.

 

$249.00

* Shipping fees apply for the options not fully online.

Pass the ICC W29 Master Mechanical Exam

Refresh your 2018 IMC, 2018 IFGC & 2017 NEC Code knowledge, and pass your ICC W29 Springfield Missouri Master Mechanical Exam. Preparing for your ICC W29 exam has never been easier! You will pass the ICC W29 exam. We guarantee it!

Your Blueprint for Success. Pass the ICC Missouri Springfield Master Mechanical Exam, Guaranteed!

Refresh your 2018 IMC, 2018 IFGC & 2017 NEC code knowledge. Successfully achieve ICC W29 certification status without leaving the comfort of your home or office. Our ICC W29 Springfield Missouri Master Mechanical exam preparation course is your best, most affordable path to success!

Pass your ICC W29 Springfield Missouri Master Mechanical exam. Our money-back guarantee backs this course. We provide the study materials (excluding codebooks) required to PASS THE ICC W29 EXAM. 


How To Use Our Online Study Center

STUDY our “Navigating the 2018 IMCA Code Primer – This eManual will familiarize you with the code’s structure within the 15 chapters of the 2018 IMC “International Mechanical Code.”

STUDY our “Navigating the 2018 IFGCA Code Primer – This eManual will familiarize you with the use, layout, and content of chapters 1 through 8 of the 2018 IFGC “International Fuel and Gas Code.”

STUDY our “Navigating the 2017 NECA Code Primer – This eManual will familiarize you with the code’s structure within the nine chapters of the 2017 NEC. National Electrical Code.

PRACTICE answering realistic exam questions using the methods explained in our “Navigating the 2017 NEC”. Over 1,000 code-specific practice questions and answers and unlimited full-length timed final exams. 

The course includes:

  • eManual (Navigating the 2018 IMC. A Code Primer)
  • eManual (Navigating the 2018 IFGC. A Code Primer)
  • eManual (Navigating the 2017 NEC. A Code Primer)
  • Printable Worksheets (Companion to 2018 IMC, 2018 IFGC & 2017 NEC eManuals)
  • Online Practice Questions (Practice looking up answers in your codebook, take full-length simulated exams)

eMANUAL  NAVIGATING THE 2018 IMC: A Code Primer – For the ICC W29 Master Mechanical Inspector Exam.

Our “NAVIGATING THE IMC” eManual helps students review the (IMC) International Mechanical Code. The eManual focuses specifically on the relationship of the IMC to the W29 Certification Exam. When you master the code, you master the exam!

This eManual is the starting point for the TLC Certification Training Program. They are designed specifically for the ICC W29 Master Mechanical Inspector exam. It will familiarize you with the use, layout, and content of the 2018 IMC. The eManual also provides a comprehensive review of study questions similar to those found on the ICC W29 Exam.

eManual Includes

  • The purpose and layout of the code
  • How to navigate the IMC
  • Code reference exercises, speed drills
  • Exam Breakdown
  • Using the Table of Contents
  • Breaking down questions by subject (Chapters 1-15)
    • Keyword Identification, how to Identify the subject of a problem for easy reference.
    • How to search for a code article by referencing the INDEX
    • Code reference example questions with in-depth solutions.

ICC allows the use of your 2018 IMC codebook when taking the W29 exam!


 eMANUAL  NAVIGATING THE 2018 IFGC: A Code Primer – For the ICC W29 Master Mechanical Inspector Exam.

Our “Navigating the 2018 IFGC Code Primer eManual” introduces the 2018 IFGC International Fuel and Gas Code.

Designed specifically for the W29 Master Mechanical Inspector exam, this eManual will familiarize you with the use, layout, and content of chapters 1 through 8 of the 2018 IFGC. The eManual also provides a comprehensive review of study questions similar to those found on the ICC W29 Exam.

eManual Includes

  • The purpose and layout of the code
  • How to navigate the IFGC
  • Code reference exercises, speed drills
  • Exam breakdown
  • Using the Table of Contents
  • Breaking down questions by subject (Chapters 1-8)
    • Keyword Identification, how to Identify the subject of a problem for easy reference.
    • How to search for a code article by referencing the INDEX
    • Code reference example questions with in-depth solutions.

ICC allows the use of your 2018 IFGC codebook when taking the W29 exam!


eManual – NAVIGATING THE 2017 NEC: A Code Primer

Our “NAVIGATING THE 2017 NEC” eManual helps students review the (NEC) National Electrical Code. When you master the code, you master your Exam!

This eManual is the starting point for the TLC Certification Training Program. It will familiarize you with the use, layout, and content of chapters 1 through 9 of the 2017 NEC.

eManual includes:

  • The purpose and layout of the code
  • How to navigate the NEC
  • Codebook navigation exercises, speed drills
  • Using the Table of Contents
  • Breaking down questions by subject (Chapters 1-9)
    • Keyword Identification, how to Identify the subject of a question for easy reference.
    • How to search for a code article by referencing the INDEX
    • Code reference example questions with in-depth solutions.

You are allowed by ICC to use the 2017 NEC codebook when taking your ICC W29 Exam!


Online – STUDY QUESTIONS & PRACTICE EXAMS

Access eManuals, Study Questions, and Simulated Exams From Any Device With Internet Access!

Our online practice questions provide a framework to practice utilizing your 2018 IMC, 2018 IFGC & 2017 NEC Codebook. Constantly utilizing your codebook to answer test questions builds up your speed and code knowledge. Our course provides the required skills to pass your ICC W29 Springfield Missouri Master Mechanical exam.

Four modes of Practice!

  • Chapter Study Mode: Covers over 1,000 ICC W29 exam practice questions & answers. (Organized as Question – Answer – Code Location)
  • Flashcard Mode: Online Virtual Flashcards provide randomized access to our entire question set and are an ideal setting to practice answering exam questions. (Organized as Question – Answer – Code Location)
  • Chapter Tests: Provides real-time feedback on each chapter of our study materials, enabling you to concentrate on chapters that need improvement.
  • Simulated Final Exams: Simulates the taking of your ICC W29 Springfield Missouri Master Mechanical exam.
    • Full length (Exact  number of questions as on W29 Exam)
    • Timed (Exact amount of time as actual ICC W29 exam)
    • Randomized (Questions are randomized, all exams are unique)
    • Properly Balanced (Balanced according to the ICC Exam schedule guaranteeing a realistic ICC W29 exam simulation)

Take as many simulated final exams as you want! (These exams help you to gain the knowledge, speed, and confidence needed to pass your ICC W29 exam effortlessly)


One-year online access: Full access membership to our online study center. Experience the convenience of learning at home or in the office, saving valuable travel time to an in-person course.


THIS PROGRAM REQUIRES YOU TO HAVE A COPY OF THE 2018 IMC, 2018 IFGC, & 2017 (NEC) NATIONAL ELECTRICAL CODE. IF YOU DO NOT POSSESS A COPY OF THESE CODEBOOKS, PURCHASE THEM BELOW.

ICC W29 Master Mechanical Exam Breakdown

When performing electrical work in a city, county, or state that requires ICC W29 Springfield Missouri Master Mechanical certification, that jurisdiction requires you to take and pass an ICC W29 examination based on the NEC.

You are allowed to use a copy of the 2018 IMC, 2018 IFGC, & 2017 NEC when taking your ICC W29 exam.

100 QUESTIONS – 4 HOUR TIME LIMIT – OPEN BOOK EXAM – 75% + TO PASS

  • Administration General Regulations (30%)
    • General Installation Requirements
    • Code Definitions
    • Plan Reading
    • Testing
  • Appliances & Mechanical Equipment (27%)
    • Heating Equipment & Gen App Installation
    • Water Heaters and Boilers
    • Cooling and Refrigeration Systems
    • Hydronic and Other Systems
  • Exhaust and Ventilation Systems (11%)
    • Exhaust Fan & Product Conveying Systems
    • Commercial Hoods & Kitchen Ventilation
  • Duct Systems (12%)
    • Duct Construction, Installation & Plenums
    • Smoke and Fire Dampers
  • Combustion Air (6%)
    • Venting of Fuel Burning Appliances
  • Chimneys and Vents (8%)
    • Venting of Fuel Burning Appliances
    • Chimney and Vent Connectors
  • Fuel Supply Systems (6%)
    • Fuel Supply Installation, Testing, and Sizing

Please click the following links to read/download the

These bulletins answer most questions raised by examination candidates. Please read them carefully, as they are a useful reference throughout your registration and examination process.

Take Your ICC W29 Exam With Pearson|VUE

Schedule the exam at your closest Pearson|VUE testing center, then submit your results to the appropriate licensing agency immediately upon passing the exam.

Take your ICC W29 Exam at the Closest Pearson|VUE Test Center

ICC exams are available at Pearson|VUE testing centers across the country.
CLICK HERE – For more information or to set up an exam with Pearson|VUE. 

Download the Springfield Missouri Contractor/Trades Examination Bulletin from ICC.


About the ICC W29 Missouri Springfield Master Mechanical exam.

This information regarding the ICC W29 exam is provided to you as a courtesy. Check with ICC at www.iccsafe.org and/or Pearson|VUE at www.pearsonvue.com/icc to verify this information’s accuracy.

  • Contact the appropriate building department for specific licensing requirements.
  • Passing an ICC national standard exam is NOT a license to practice and does not guarantee a license in any jurisdiction.
  • To acquire a license to practice, you must apply to the specific state licensing agency or building department and meet all of their licensing requirements.

Pearson|VUE requirements/recommendations for scheduling the ICC W29 exam.

IMPORTANT: ICC has been split into different testing programs on its website. You will need to know the three-digit exam code before registering for your Contractor/Trades exam. Each testing program will require a unique username and password.

The Contractor/Trades program is also split into exams that require pre-authorization and exams that do not require pre-authorization. View the current exams that require pre-authorization OR do not require pre-authorization.


To create an account, schedule an exam, view exams, or find a test center, please go to home.pearsonvue.com/icc/license.

Add the 2018 IMC SOFTCOVER
Required Codebook (Sold Separately) $132.95

The scope of the (IMC®) International Mechanical Code® Establishes minimum regulations for mechanical systems using prescriptive and performance-related provisions.


You are allowed to use the 2018 IMC when taking your W29 Exam!

2018 IMC FAST-TABS
Codebook Navigation Aid (Sold Separately) $17.95

Tab your Codebook. Fast-Tabs help you navigate the 2018 IMC quickly and efficiently. Fast-tabs are a must-have item for IMC users and can dramatically lower the time spent searching through the codebook.


You are allowed to use IMC Fast-Tabs when taking your W29 Exam!

Add the 2018 IFGC SOFTCOVER
Required Codebook (Sold Separately) $132.95

The scope of the (IFGC®) International Fuel Gas Code® addresses the design and installation of fuel gas systems and gas-fired appliances through prescriptive and performance requirements.


You are allowed to use the 2018 IFGC when taking your W29 Exam!

2018 IFGC TURBO-TABS
Codebook Navigation Aid (Sold Separately) $21.00

Tab your Codebook. Fast-Tabs help you navigate the 2018 IFGC quickly and efficiently. Fast-tabs are a must-have item for IFGC users and can dramatically lower the time spent searching through the codebook.


You are allowed to use IFGC Fast-Tabs when taking your W29 Exam!

2017 NEC Softcover
Required Codebook (Sold Separately) $199.95

Adopted in all 50 states, NFPA 70, National Electrical Code (NEC) is the benchmark for safe electrical design, installation, and inspection to protect people and property from electrical hazards.


THIS PROGRAM REQUIRES YOU TO HAVE A COPY OF 2017 (NEC). IF YOU DO NOT OWN A COPY OF THIS CODEBOOK, PURCHASE ONE IMMEDIATELY.

 

 

2017 NEC FAST-TABS
Codebook Navigation Aid (Sold Separately) $10.95

Tab your Codebook. Fast-Tabs help you navigate the 2017 NEC quickly and efficiently. Fast-tabs are a must-have item for NEC users and can dramatically lower the time spent searching through the codebook.


You are allowed to use our NEC Code Fast-Tabs when taking your W29 Exam!

Take our Free ICC W29 Master Mechanical Exam

Pass this 20 question free ICC W29 Master Mechanical test, learn where you stand! These free ICC W29 Mechanical practice questions, based on the 2018 IMC, 2018 IFGC & 2017 NEC, are similar to those on the ICC W29 Master Mechanical exam.

 

  • If you answer sixteen or more of these free ICC W29 practice questions correctly, you are in pretty good shape.
  • However, if you miss four or more questions, get this course, you are in danger of failing your ICC W29 exam.

Solar energy system components that contain pressurized fluids must be protected against pressures and temperatures exceeding design limitations with a __________.

Correct! Wrong!

The flow velocity of a ground-source heat pump ground-loop piping system must be controlled to ___________ the possibility of water hammer.

Correct! Wrong!

Where a cable or raceway type wiring method is installed through bored holes in joist, rafters, or wood members, in both concealed and exposed locations, holes must be bored so that the edge of the hole is __________ in. or more from the nearest edge of the wood member. Where the distance is not possible, the cable or raceway must be protected from penetration by nails or screws by use of a steel bushing or plate, __________ in thick or more, and of the correct length and width installed to cover the area where the wiring is located.

Correct! Wrong!

Using the Branch Length Method, find the size of semirigid copper tubing for Section D shown in the graphic above. The gas being used has a specific gravity of 0.60 and a 1,000 BTU/cu. ft. (37.5 MJ/m3) heating value. The designated pressure drop is 1-inch w.c. (250 Pa).

Correct! Wrong!

Of the following, which is not a type of valve required by the code to be between the connection of the liquid piping and the dispenser hose at a LP-gas motor vehicle fuel-dispensing facility?

Correct! Wrong!

All 15- and 20-ampere, single-phase, 125-volt receptacles shall be protected by a GFCI if they are within what minimum distance to the inside walls of a permanently installed swimming pool?

Correct! Wrong!

Type F steel pipe must only be used for refrigerant lines that have an operating temperature less than __________.

Correct! Wrong!

When a vent connector is installed it should be with an upward slope toward the vent or chimney a minimum of ___________ inch(s) per foot, without dips or sags.

Correct! Wrong!

When a dwelling has a 1500 sq. ft. floor area, an unfinished attic, an unfinished cellar not adaptable for future use, and open porches. It has a 12-kW range and a 5.5 kW, 240-V dryer for appliances. Assume kW ratings for both are equivalent to kVA ratings in accordance with Article 220.54 and 220.55. The number of branch general light circuits is at least __________.

Correct! Wrong!

Steam-heating boilers that exceed 5,000 pounds of steam per hour must have a minimum clearance of __________ from the top of the boiler to the ceiling.

Correct! Wrong!

Gas piping systems installed underground must be at least __________ inches below grade, except as detailed in Section 404.12.1.

Correct! Wrong!

Snap switches must not be ganged or grouped in enclosures with other receptacles, snap switches, or similar devices, unless they are placed so that voltage is ___________ volts or less between adjacent devices, or unless placed in enclosures with securely installed, identified barriers between adjacent devices.

Correct! Wrong!

Return air openings of forced-air warm-air furnaces must not be located less than __________ measured in any direction from an open combustion chamber or draft hood of another appliance located in the same room or space.

Correct! Wrong!

Appliances in attics must have an unobstructed passageway and opening of a size that allows the largest appliance to be __________.

Correct! Wrong!

What is required for a control transformer when a 240-volt wye-connected motor gets power from a converted single-phase source, and it is intended to connect a 120/240-volt transformer to control the motor on the load side of the converter?

Correct! Wrong!

What is the correct term for a metal-on-metal compression joint where a conical spread is on the end of a flare tube, and compressed by a flare nut against a mating flare?

Correct! Wrong!

When the provisions of the code cannot be carried out due to practical difficulties, the code official has the authority in individual cases to grant ___________.

Correct! Wrong!

When electrical metallic tubing (EMT) is installed in a 50 foot conduit run, what is the minimum trade size required for enclosing eight (8) size 6 AWG copper conductors with THHW insulation?

Correct! Wrong!

Ducts in private garages that penetrate a wall or ceiling that separates a dwelling from a private garage must be constructed of sheet steel a min. of __________ thick.

Correct! Wrong!

A 16-inch diameter vent connector for a medium-heat appliance that has an internal area of 190 square inches has a minimum thickness of __________.

Correct! Wrong!

2018 IMC + 2018 IFGC + 2017 NEC